Anyway, here are a few pics of the supplies..
These sheets are 12 feet long. 12 feet! You can cover a lot of space, and fast, with boards that long!
More sheets! (And, in the back of this pic, you can see the Durock (for the shower) standing against the far wall.)
Plaster anyone?
My buddy Dave (the plumber) was over last night as well, installing the liner for the shower. Now the Durock can be installed over the leading edges of the liner, ensuring water-tightness all around. Sweet!
I’ll keep posting pics as the week progresses…
No comments:
Post a Comment